Monday, July 25, 2011
Shower Floor
This is the "extra" bathroom -- all the red stuff will be covered in tile. The red stuff is a painted on rubber type of stuff to help waterproof underneath the tiles - Isn't this a cool shower floor?
One Bathroom almost tiled!
Monday, July 11, 2011
Front Door (foyer) Tiled "Rug" area


This area will be covered in hardwood so we designed this tile "rug" area by the front door so we won't have to ever worry about a wet rug on the wood floor. 12 inch tiles on the diagonal with 2 inch mosaic tiles on the border. The 12 inch tiles are cemented in, but the mosaic ones aren't permanently set yet. I'm pretty excited about this project!
Sunday, July 10, 2011
Day 3 tile
Saturday, July 9, 2011
Day 2 - Tile
Friday, July 8, 2011
Wednesday, June 29, 2011
Lights at Night
Sunday, June 26, 2011
Tile & Wood Samples

We've decided on this wood & tile. Kitchen will be a pattern with the 18" tiles and some 6" ones from the same line. The showers will have the 2" mosaic on the floors, 6 or 12" ones on the walls, and the little glass tiles as an accent about eye level. The wood is an engineered maple with distress signs so they won't look "too perfect" -- Also took this picture in the kitchen so you could see how the walls look with this flooring.
Monday, June 13, 2011
Power Soon!
All the lighting is installed.
Outlets and switches all wired.
All electrical panels wired.
Electrical Inspection passed.
Co-op has us scheduled to turn on the power on this WEDNESDAY!!!
Outlets and switches all wired.
All electrical panels wired.
Electrical Inspection passed.
Co-op has us scheduled to turn on the power on this WEDNESDAY!!!