Saturday, January 29, 2011

Drywall Soon!!!

I'm going to throw it out there...I think we'll have drywall next week!!! The wait is on to see if it all works out.

Shower floor started in this bathroom too



I swear this is the last bathroom...you'd think we had seven kids...




Tub # 3 installed & shower "pan" started in Master



Bathtubs are all in now...and you can see in our shower that dark gray color on the floor is the mortar for our shower floor (started) now.

Bathtub with Backerboard installed


Drains are in and backerboard is ready for tile on tub # 2 -- Tip: For about $15, he bought a roll of insulation and insulated around all of the bath tubs. This way when you run a hot bath, it will stay hot!

Trimming out the Front Porch

Last weekend we trimmed out a bunch of the exposed beams across the front porches with hardiboards, much prettier now.

Sunday, January 23, 2011

Saturday, January 15, 2011

Possible Tile Choice

Possibly like the Marazzi Jade Ochre tile for the kitchen & Baths

Friday, January 14, 2011

Insulation is DONE - except the blown in stuff.

View of Kitchen from Living room, the two pipes sticking up are my future kitchen sink on a peninsula counter/cabinet
Living Room :


Inside master bath looking towards potty closet and clothes closet:


Master Bedroom:







Wednesday, January 12, 2011

YIPPEE!

Insulation will be installed Friday!

Saturday, January 8, 2011

Screened in back porch - Beadboard installed in Ceiling

Still missing one little piece and the trimmings

Bathroom Floors with Tile Backerboard Installed



He even let the girls and me help! I didn't even complain about the blister I got from the trowel...

Saturday, January 1, 2011

Major Inspection Passed! Framing!

We passed our framing/plumbing rough in/electrical rough in inspection yesterday. We're starting off the new year getting quotes for insulation and drywall!